Migrate to the Cloud Without Losing a Day

We migrate enterprise workloads to the cloud safely and predictably — with minimal downtime, clear rollback plans and no surprises.

Azure MigrateAWS Migration HubTerraformAzure Site Recovery
Book a free consultation
Deka Technology engineers working on cloud migration projects
500+
Workloads migrated
0
Data loss incidents
< 4 hrs
Typical migration downtime
99.9%
Post-migration uptime
THE CHALLENGE

Migration without a map

Cloud migration sounds simple: move servers from here to there. In practice, it involves dependency mapping, data replication, network reconfiguration, security posture changes, application compatibility testing and organizational change management. Each workload has its own migration strategy — lift-and-shift, re-platform or refactor.

The enterprises that fail at migration are the ones that treat it as a technical project. Successful migration requires a program approach: phased execution, clear rollback procedures, parallel operation periods and stakeholder communication at every stage.

OUR APPROACH
01

Discover & Plan

We inventory all workloads, map dependencies, assess cloud readiness and define the migration strategy for each application — lift-and-shift, re-platform or refactor.

02

Migrate & Validate

Phased migration with parallel operation. Each workload is tested in the cloud environment before cutover. Rollback plans ready for every stage.

03

Optimize & Operate

Post-migration optimization: right-sizing, reserved capacity, monitoring and cost governance. Operational handover with runbooks and training.

CAPABILITIES

What we deliver

Workload Assessment

Automated discovery and dependency mapping of all on-premise workloads. Each application gets a migration strategy recommendation with effort estimate and risk profile.

Lift-and-Shift

Rapid migration of compatible workloads to cloud VMs with minimal changes. The fastest path to cloud — suitable for stable, well-understood applications.

Re-Platforming

Migration with optimization: moving to managed services (PaaS), updating database engines, adopting cloud-native storage. Better performance and lower cost than pure lift-and-shift.

Database Migration

SQL Server, Oracle, PostgreSQL and MySQL migrations with data validation, schema optimization and high-availability configuration. Zero-downtime migration for critical databases.

Hybrid Connectivity

VPN, ExpressRoute/Direct Connect and SD-WAN configuration for hybrid environments. Secure, reliable connectivity between on-premise and cloud resources.

Migration stalled or worried about downtime and data loss?

Talk to a migration engineer who has moved 1 000+ workloads to the cloud.

Discuss your project
500+
Workloads migrated
0
Data loss incidents
< 4 hrs
Typical migration downtime
99.9%
Post-migration uptime
PROJECT SPOTLIGHT
CLOUD MIGRATION

Arabam.com

CHALLENGE

Critical SQL Server databases running on aging hardware with no high availability. Any downtime meant direct revenue loss.

APPROACH

We migrated to SQL Server 2019 Always On availability groups in Azure, with automated failover and read replicas. Migration completed during maintenance window with zero data loss.

RESULT

Zero-downtime migration. High availability with automatic failover. 40% improvement in query performance on cloud-optimized infrastructure.

Zero data lossAuto-failover40% faster queries
USE CASES

Where we apply it

  • Exit your data center on schedule with zero data loss
  • Move databases to managed cloud services with auto-failover
  • Run hybrid cloud without connectivity headaches
  • Re-platform legacy apps for better performance and lower cost
  • Distribute workloads across clouds for resilience and savings
TECHNOLOGY

Technologies

Azure MigrateAWS Migration HubTerraformAzure Site RecoveryDMSVPNExpressRouteVMware HCX
TECHNOLOGY PARTNERS
Microsoft Microsoft
AWS AWS
VMware VMware
FAQ

Common questions about cloud migration

How long does a cloud migration take? +

A single application takes 2-6 weeks depending on complexity. An enterprise migration program with 50+ workloads typically runs 6-12 months with phased execution — early wins delivered in the first month.

Can you guarantee zero downtime? +

For most workloads, we achieve zero or near-zero downtime using replication, parallel operation and staged cutover. Critical databases use Always On or similar HA setups. Every migration has a documented rollback plan.

What about data sovereignty and compliance? +

We ensure data residency requirements are met by choosing appropriate cloud regions. Encryption in transit and at rest is configured by default. Compliance controls are validated before and after migration.

Should we lift-and-shift or refactor? +

Start with lift-and-shift for stable, well-understood applications — it is the fastest path to cloud. Refactor applications that need to scale, have performance problems, or would significantly benefit from managed services. We recommend based on each workload.

Discuss your specific setup →

Related case studies

View all →
DATABASE
Database upgrade with SQL Server 2019 Always On
Arabam.com
INFRASTRUCTURE
IT infrastructure management
Anadolu Group

Let's build something that works.

No commitment. Just a clear conversation about your project.

Discuss your project